عرض بسيط للتسجيلة

المؤلفSenouci, Ahmed B.
المؤلفAl-Derham, H.R.
تاريخ الإتاحة2009-12-28T07:54:54Z
تاريخ النشر2007-08-15
اسم المنشورAdvances in Engineering Software
المعرّفhttp://dx.doi.org/10.1016/j.advengsoft.2007.08.002
الاقتباسAhmed Senouci, Hassan R. Al-Derham, Genetic algorithm-based multi-objective model for scheduling of linear construction projects, Advances in Engineering Software, Volume 39, Issue 12, December 2008, Pages 1023-1028
معرّف المصادر الموحدhttp://hdl.handle.net/10576/10518
الملخصThis paper presents a genetic algorithm-based multi-objective optimization model for the scheduling of linear construction projects. The model allows construction planners to generate and evaluate optimal/near-optimal construction scheduling plans that minimize both project time and cost. The computations in the present model are organized in three major modules. A scheduling module that develops practical schedules for linear construction projects. A cost module that computes the project's costs. A multi-objective module that searches for and identifies optimal/near-optimal tradeoffs between project time and cost. An application example is analyzed to illustrate the use of the model and to demonstrate its capabilities in optimizing the scheduling of linear construction projects.
اللغةen
الناشرElsevier Ltd
الموضوعCost control
Genetic algorithms
Information technology (IT)
Linear construction projects
Multi-objective optimization
Scheduling
العنوانGenetic algorithm-based multi-objective model for scheduling of linear construction projects
النوعArticle


الملفات في هذه التسجيلة

الملفاتالحجمالصيغةالعرض

لا توجد ملفات لها صلة بهذه التسجيلة.

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة