Show simple item record

AuthorElmasry M.
AuthorZayed T.
AuthorHawari A.
Available date2020-04-25T01:02:22Z
Publication Date2019
Publication NameJournal of Construction Engineering and Management
ResourceScopus
ISSN7339364
URIhttp://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001599
URIhttp://hdl.handle.net/10576/14478
AbstractInspection activities play an important role in the operation and maintenance (O&M) strategy in municipalities. Efficient O&M strategies can help in making informed decisions based on the actual condition of pipelines collected from inspection activities. Municipalities are in dire need of optimizing inspection activities due to the competitive needs for the large number of deteriorated sewer pipelines and limited budget allocated for inspections. This paper presents an optimization model for inspection of deteriorated sewer pipelines using multiobjective optimization technique for which time, cost, and number of inspected sections are optimized using mixed integer linear programming (MILP). The general algebraic modeling system (GAMS) is used to reduce the computational complexity of the proposed optimization model. A case study for an existing sewage network in the city of Doha, Qatar, is used to demonstrate the capabilities of the optimization model. The results obtained from implementing the optimization model showed an enhancement of 25.7, 44.4, and 6.5% for time, cost, and number of sections inspected when compared with the results for the same model using the genetic algorithm (GA). Additionally, a cost-saving of 68% could be achieved if the proposed optimization model was deployed instead of the current inspection practices carried out by the municipalities in Doha, Qatar. It is expected that the proposed model could be used to reduce both the cost and time of inspection, especially in cases of limited budget and work forces.
SponsorThis publication was made possible by NPRP Grant No. (NPRP6-357-2-150) from the Qatar National Research Fund (a member of The Qatar Foundation). The statements made herein are solely the responsibility of the authors. The authors would like to thank the public works authority of Qatar (ASHGAL) for their support in the data collection.
Languageen
PublisherAmerican Society of Civil Engineers (ASCE)
SubjectConsequences of failure
Inspection scheduling
Likelihood of failure
Multiobjective optimization
Risk assessment
Wastewater pipelines
TitleMulti-Objective Optimization Model for Inspection Scheduling of Sewer Pipelines
TypeArticle
Issue Number2
Volume Number145


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record