Show simple item record

AuthorZhao, Xufeng
AuthorAl-Khalifa, Khalifa N.
AuthorHamouda, Abdel Magid
AuthorNakagawa, Toshio
Available date2021-09-05T05:40:14Z
Publication Date2016
Publication NameProceedings - 22nd ISSAT International Conference on Reliability and Quality in Design
ResourceScopus
URIhttp://hdl.handle.net/10576/22691
AbstractA new periodic damage model for preventive replacement policies is proposed in this paper, where the damage produced by shocks is only measured at periodic times, without considering the mathematical models of the stochastic shock and cumulative process of damage. We model five replacement policies using three approaches of whichever triggering event occurs first, whichever triggering event occurs last, and replacing over a planned measure, which are named as replacement first, replacement last, over-damage replacement, over-damage replacement first, and over-damage replacement last, respectively. In an analytical way, we obtain their optimum replacement times to minimize the expected cost rates and compare them to find which model saves cost for a long run. 2016, International Society of Science and Applied Technologies. All rights reserved.
Languageen
PublisherInternational Society of Science and Applied Technologies
SubjectCumulative damage
Over-damage replacement
Periodic damage
Replacement first
Replacement last
TitleReplacement policies for periodic damage models
TypeConference Paper
Pagination228-232
dc.accessType Abstract Only


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record