عرض بسيط للتسجيلة

المؤلفDawod A.B.A.
المؤلفAbbasi S.A.
المؤلفAl-Momani M.
تاريخ الإتاحة2020-03-03T06:19:03Z
تاريخ النشر2018
اسم المنشورQuality and Reliability Engineering International
المصدرScopus
الرقم المعياري الدولي للكتاب7488017
معرّف المصادر الموحدhttp://dx.doi.org/10.1002/qre.2305
معرّف المصادر الموحدhttp://hdl.handle.net/10576/13104
الملخصControl charts are mainly carried out in 2 interconnected phases: Phase I (retrospective phase) and Phase II (monitoring phase). Phase I uses a stable historical sample to establish control limits that will be used later in Phase II. The preciseness of the control limits obtained from Phase I can greatly affect the performance of control charts in Phase II. Monitoring the coefficient of variation (CV) is an effective approach when the process mean or standard deviation is not constant. Until now, little work has been dedicated on investigating the performance of CV control charts in Phase I. Viewed under this perspective, this study investigates the performance of CV control charts in Phase I in terms of probability to signal. A real-life example is also provided to illustrate the working of CV charts in Phase I.
راعي المشروعThe author Saddam Akber Abbasi would like to acknowledge the support of Qatar University, Qatar for providing excellent research facilities. The authors Abdaljbbar Dawod and Marwan Al-Momani would like to thank King Fahd University of Petroleum and Minerals, KSA for extraordinary research support.
اللغةen
الناشرJohn Wiley and Sons Ltd
الموضوعcoefficient of variation
control chart
FAP
Phase I
probability to signal
العنوانOn the performance of coefficient of variation control charts in Phase I
النوعArticle
الصفحات1029 - 1040
رقم العدد6
رقم المجلد34
dc.accessType Abstract Only


الملفات في هذه التسجيلة

الملفاتالحجمالصيغةالعرض

لا توجد ملفات لها صلة بهذه التسجيلة.

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة