An Integrated Quay Crane Assignment and Scheduling Problem Using Branch-and-Price
(
Institute of Electrical and Electronics Engineers Inc.
, 2017 , Conference Paper)
This paper investigates the integrated quay crane assignment and scheduling problem (QCASP). The problem requires determining the assignment of quay cranes to vessels and the scheduling of operations to be performed by ...
Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem
(
Hindawi Limited
, 2016 , Article)
The problem addressed in this paper is the two-machine job shop scheduling problem when the objective is to minimize the total earliness and tardiness from a common due date (CDD) for a set of jobs when their weights equal ...