Show simple item record

AuthorAlkadour, Firas
AuthorChelliah, Anbalagan
AuthorTzaveas, Theodoros
AuthorKara, Ali
Available date2023-08-27T05:58:07Z
Publication Date2023
Publication Name2nd International Conference on Civil Infrastructure and Construction
CitationAlkadour F., Chelliah A., Kara A. & Tzaveas T.,"Box Jacking Method Implementation in Rock for Mesaimeer Pedestrian Underpass Structure in Qatar", The 2nd International Conference on Civil Infrastructure and Construction (CIC 2023), Doha, Qatar, 5-8 February 2023, DOI: https://doi.org/10.29117/cic.2023.0052
ISSN2958-3128
URIhttps://doi.org/10.29117/cic.2023.0052
URIhttp://hdl.handle.net/10576/46755
AbstractMesaimeer pedestrian underpass is proposed under the live traffic of Sabah Al Ahmad Road, Doha, Qatar which consists of a four dual lane carriageway, in addition to diverge lanes, service road lanes and right turn lanes by box jacking/pushing method for a total distance of 80.6 m. Due to the necessity of maintaining undisturbed traffic and to avoid disruption of the existing utilities crossing over the underpass alignment, the use of conventional Cut and Cover method is not feasible. Accordingly, trenchless construction method by box jacking/pushing is to be implemented in weathered limestone rock overlaid by fill soil. The method of construction of box jacking includes constructing shaft as launching pit for jacking operation, aligning the precast concrete box into position, excavating the soil/rock at the face of the precast concrete box, then pushing the box into the excavated length, and repeating the process. This paper includes overview of the project and its challenges intending to bring greater familiarity with the box jacking process in rock formation. The design and anticipated construction challenges are discussed from both structural and geotechnical perspectives. The challenges faced include box segment protection details, waterproofing details, construction and expansion joint details, high jacking loads due to rock formation, excavation advancement rate, necessity of grouting at box over-head and impact on existing utilities. Both structural and geotechnical analysis/design are assessed by numerical finite element modelling (FEM). Further, instrumentation and monitoring measures are planned to monitor various utilities and assess the impact during construction.
Languageen
PublisherQatar University Press
SubjectBox Jacking in rock
Underpass construction
Trenchless construction
Structure in Qatar
TitleBox Jacking Method Implementation in Rock for Mesaimeer Pedestrian Underpass Structure in Qatar
TypeConference Paper
Pagination382-390
ESSN2958-3136


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record