• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • About QSpace
    • Vision & Mission
  • Help
    • Item Submission
    • Publisher policies
    • User guides
      • QSpace Browsing
      • QSpace Searching (Simple & Advanced Search)
      • QSpace Item Submission
      • QSpace Glossary
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • University Publications
  • QU Conference Proceedings
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 1: Contemporary issues in Construction Engineering and Management
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • University Publications
  • QU Conference Proceedings
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 1: Contemporary issues in Construction Engineering and Management
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Why Construction Projects are delayed in PWA: Problems and Solutions

    Thumbnail
    View/Open
    049.pdf (446.1Kb)
    Date
    2023
    Author
    Al Marri, Dana Ahmad
    Al Kaabi, Noof Mohamed
    Metadata
    Show full item record
    Abstract
    Construction is, by its nature, complex and uncertain. Changes and variations are inherently part of many construction projects, which require serious efforts to overcome. Project delay is a construction problem resulting in contractual claims, increased project cost, and decreased end-user satisfaction. This study investigates the root causes of project delay in Public Works Authority construction projects and gathers different perceptions on the causes of delay to propose a solution matrix that mitigate the effect of those delays and prevents its reoccurrence in future projects. A sample of over two-handed projects in 2021 have been granted an extension of time to its original completion date have been studied to identify and analyse the root causes of project delay and the risk relevant to the project delivery being prolonged. For these reasons, a categorization of delay has been adopted, and every cause of delay has been coded. The method adopted to identify the top root causes of project delay was the Pareto Analysis (Pareto analysis is premised on the idea that 80% of problems can be traced to 20% of the causes). The result of the study was the development of a holistic solution matrix to address the root causes of delay. The solution consists of two parts, (1) identify the relevant corrective, immediate and preventive actions, and (2) develop a responsibility matrix for the implementation of those solutions to ensure its governance.
    URI
    https://doi.org/10.29117/cic.2023.0049
    DOI/handle
    http://hdl.handle.net/10576/47083
    Collections
    • Theme 1: Contemporary issues in Construction Engineering and Management [‎39‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us
    Contact Us | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policies

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us
    Contact Us | QU

     

     

    Video