عرض بسيط للتسجيلة

المؤلفVerros, Panagiotis
المؤلفAl-Marri, Saad Zayed
المؤلفKyriakopoulos, Alexios
المؤلفAlvanitopoulos, Lefteris
تاريخ الإتاحة2023-08-31T13:19:33Z
تاريخ النشر2023
اسم المنشور2nd International Conference on Civil Infrastructure and Construction (CIC 2023)
الاقتباسVerros P., Al-Marri S.Z., Kyriakopoulos A. & Alvanitopoulos L., "Design Considerations of MPSO Marine Outfall and Diffuser Field", The 2nd International Conference on Civil Infrastructure and Construction (CIC 2023), Doha, Qatar, 5-8 February 2023, DOI: https://doi.org/10.29117/cic.2023.0172
الرقم المعياري الدولي للكتاب2958-3128
معرّف المصادر الموحدhttp://dx.doi.org/10.29117/cic.2023.0172
معرّف المصادر الموحدhttp://hdl.handle.net/10576/47125
الملخصThe purpose of the Musaimeer Pump Station and Outfall (MPSO) project is to receive storm water runoff and groundwater flows from the Abu Hamour Tunnel and to provide a pumping station, a marine outfall tunnel and a diffuser field to dispose of the flows into the sea. Musaimeer outfall tunnel is one of the longest storm water tunnels in the world with a total length of 10.2 km. The tunnel is connected via a drop shaft to the main pump station. This system will accommodate surface and storm water received from the drainage networks of 190 km2 of urban areas in southern Doha. The outfall tunnel comprised precast segmental lining with internal diameter of 3700 mm sloped at 0.05% upward to the riser shaft. The riser shaft, which is located at the end of the outfall tunnel, is connected to a diffuser field positioned on the Arabian Gulf seabed. This paper will focus on the design considerations and recommendations related Marine outfall riser shaft, distribution manifolds and diffuser field. to The MPSO marine outfall was designed in two phases, first comprising installation of riser shaft, primary and secondary manifolds, 3 lines of HDPE piping with variable internal diameter, 84 diffuser duckbill valves, 84 diffuser protection boxes and scour protection. The diffuser is laid in an area of 280mX40m 15m beneath the sea water level. Second phase of marine outfall design included the meticulous connection works between GRP riser shaft and 10.2km TBM tunnel 15m beneath the seabed. Design considerations and final conclusions of such marine design works will be presented.
اللغةen
الناشرQatar University Press
الموضوعMarine outfall Design
Riser shaft
Scour protection
Diffuser field
Duckbill valves
العنوانDesign Considerations of MPSO Marine Outfall and Diffuser Field
النوعConference Paper
الصفحات1392-1400
ESSN2958-3136
dc.accessType Open Access


الملفات في هذه التسجيلة

Thumbnail

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة