• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • University Publications
  • QU Conference Proceedings
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 4: Water, Environment, and Climate Change
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • University Publications
  • QU Conference Proceedings
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 4: Water, Environment, and Climate Change
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Challenging Hydraulic Aspects of MPSO Project, Qatar's Showcase for Storm Water Outfall

    Thumbnail
    View/Open
    173.pdf (1.236Mb)
    Date
    2023
    Author
    Verros, Panagiotis
    Miranda, Joao Carlos Henriques
    Manojlovic, Nikola
    Kyriakopoulos, Alexios
    Metadata
    Show full item record
    Abstract
    The purpose of the Musaimeer Pump Station and Outfall (MPSO) project is to receive storm water runoff and groundwater flows from the Abu Hamour Tunnel and to provide a pumping station, a 10 km marine outfall tunnel and a diffuser field to dispose of the flows into the sea. The project site is located immediately south of the land that was reclaimed for the newly constructed Hamad International Airport (HIA) at the eastern terminus of the Abu Hamour Tunnel which forms a link to allow discharge of storm flows collected in the southern and western parts of the Doha over a total catchment area of approximately 190 km2. Hydraulic Design for MPSO (Musaimeer pumping station and outfall) was implemented for dry weather flow of 1.9m3/sec and wet weather flow of 19.7m3/sec. The system was designed with increased operational redundancy including 2 screen channels, bar screens and grab rakes, each channel being able to handle the maximum design flow, 2 wet wells with grit removal and oil and grease removal system, 10 submersible pumps (9 duty+1 standby), outfall chamber, drop shaft, 10 km marine outfall tunnel and diffuser field comprising of 6 HDPE pipe branches and 84 non return diffuser ports-duckbill valves. Hydraulic Design calculations were cross verified by CFD modelling, physical modelling in 1:9 scale and surge analysis results concluding on final hydraulic design conclusions and recommendations. Hydraulic Design parameters presented in this paper were verified during operation and maintenance period of the project and will be demonstrated herewith.
    DOI/handle
    http://dx.doi.org/10.29117/cic.2023.0173
    http://hdl.handle.net/10576/47126
    Collections
    • Theme 4: Water, Environment, and Climate Change [‎40‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video