Search
Now showing items 1-8 of 8
Integration of Environmental and Sustainability Management Practices into Construction Industry: A Case Study
(
Qatar Univesrity Press
, 2020 , Conference Paper)
Integration of environmental and sustainability management into the construction
industry has become essential as a result of a need to improve financial performance,
adopt international protocols in a global marketplace, ...
Geotechnical Aspects of Sub-Sea Tunnelling on the Musaimeer Pumping Station and Outfall Tunnel Project
(
Qatar Univesrity Press
, 2020 , Conference Paper)
Musaimeer outfall tunnel is one of the longest storm water tunnels in the world with
a total length of 10.2 km. The tunnel is connected via a drop shaft to the main pump
station. This system will accommodate surface and ...
Comparison of Geotechnical Investigation Results with Encountered Ground Conditions during Subsea Tunnelling in Qatar
(
Qatar University Press
, 2023 , Conference Paper)
Starting in 2018, Musaimeer Pumping Station and Outfall Project (MPSO) was constructed to manage ground and storm water received from 270 km2 area of southern Doha, Qatar. The project consists of a pumping station, subsea ...
Tunnel Surveying Works: A Technical Challenge of 10 km-long tunnel under the Arabian Gulf-Qatar
(
Qatar University Press
, 2023 , Conference Paper)
The Musaimeer Pump Station & Outfall Tunnel project (MPSO) was constructed as one of the longest Outfall tunnels in the World with a total length of 10.189m and at the same time being the longest undersea tunnel in the ...
Sustainability Driven Strategy for Achieving Sustainable Infrastructure: Musaimeer Pumping Station and Outfall Project
(
Qatar University Press
, 2023 , Conference Paper)
The increasing emphasis on global sustainability issues such as climate change, loss of biodiversity, deforestation, and water scarcity has provided a strong mandate for the construction industry to incorporate sustainable ...
Planning and Implementing of Effective Enabling Works for a Successful TBM Tunnelling Project
(
Qatar University Press
, 2023 , Conference Paper)
The outfall tunnel, which forms part of the Musaimer Pump Station and Outfall project (MPSO), is a 10.2 km long subsea tunnel that extends from the south coast of Doha, starting onshore, and continues under the Arabian ...
TBM Challenges on Musaimeer outfall tunnel
(
Qatar University Press
, 2023 , Conference Paper)
Musaimeer outfall tunnel is the longest outfall tunnel in the Middle East. The tunnel was excavated by Earth Pressure Balance (EPB), Tunnel Boring Machine (TBM) and encountered three distinct rock masses namely Rus Formation, ...
Diffuser Bed Construction Challenges on the Musaimeer Pump Station and Outfall Project
(
Qatar University Press
, 2023 , Conference Paper)
Musaimeer Pump Station and Outfall project (MPSO) is a strategically important drainage asset initiated, developed, and completed by Ashghal in 2022. This project accommodates ground and storm water received from the ...