عرض بسيط للتسجيلة

المؤلفAl Tabtabai, Hashem M.
تاريخ الإتاحة2009-11-25T13:05:16Z
تاريخ النشر2002
اسم المنشورEngineering Journal of Qatar University
الاقتباسEngineering Journal of Qatar University, 2002, Vol. 15, Pages 19-37.
معرّف المصادر الموحدhttp://hdl.handle.net/10576/7921
الملخصThe paper presents a study based on a research that analyzes and ranks the causes of delays in building and housing type projects undertaken by governmental agencies in Kuwait. The study was based on a survey with the parties involved in these governmental projects. A questionnaire containing 53 delay causes was distributed and the respondents were 23 governmental management and engineering personnel, 17 contractors and 8 designers representing A/E firms. The questions were prepared in which the causes were categorized into eight major groups: 1) client administration and organizational, 2) client's site supervision, 3) contractor related, 4) labor related 5) quality related, 6) design related, 7) project management, and 8) contractual related. The factors were measured and ranked under each group by the 'Relative Importance Index' for three parties. The results suggest that delays are attributed to poor project management factors and client's administration and site supervision practices. The paper presents recommendations for a better application of project management techniques and procedures being taken at both conceptual and detailed planning phases of projects.
اللغةen
الناشرQatar University
الموضوعEngineering: Research Papers
العنوانCauses For Delays In Construction Projects In Kuwait
النوعArticle
الصفحات19-37
رقم المجلد15
dc.accessType Open Access


الملفات في هذه التسجيلة

Thumbnail

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة