Author | Al Salem, Ameer |
Author | Armacost, Robert L. |
Available date | 2009-11-25T13:07:13Z |
Publication Date | 2002 |
Publication Name | Engineering Journal of Qatar University |
Citation | Engineering Journal of Qatar University, 2002, Vol. 15, Pages 193-210. |
URI | http://hdl.handle.net/10576/8020 |
Abstract | In this paper we present a new heuristic algorithm to minimize the makespan for scheduling jobs on unrelated parallel machines with machine eligibility
restrictions ( R^ I M .1 C^^). To the best of our knowledge, the problem has not
been addressed previously in the literature. The multi-phase heuristic algorithm incorporates new concepts from the multi-depot vehicle routing in the constructive heuristic. A computational study includes problems with two or four machines, up to 105 jobs, and three levels of a machine selection parameter. The heuristic algorithm solution values are compared to optimal solution values. The results show that the heuristic algorithm can yield solutions within a few percent of the optimal solutions with performance improving as the number of jobs to be scheduled increases. |
Language | en |
Publisher | Qatar University |
Subject | Engineering: Mechanical Engineering
|
Title | Unrelated Machines Scheduling With Machine Eligibility Restrictions |
Type | Article |
Pagination | 193-210 |
Volume Number | 15 |
dc.accessType
| Open Access |