Assessing the risk perception of cost overrun through importance rating
المؤلف | Gunduz M. |
المؤلف | Maki O.L. |
تاريخ الإتاحة | 2020-03-03T06:19:01Z |
تاريخ النشر | 2018 |
اسم المنشور | Technological and Economic Development of Economy |
المصدر | Scopus |
الرقم المعياري الدولي للكتاب | 20294913 |
الملخص | Cost overrun in construction projects is a common issue affecting project performance. After a review of the literature, a list of 39 cost overrun attributes were gathered and presented in a survey. The survey was distributed online to construction professionals. 101 complete responses were received and analyzed by importance index, frequency index, cost index, frequency adjusted cost index, Spearman's rank correlation, student's t-test, risk assessment and factor analysis. The results of the survey revealed that the main causes of cost overrun in construction industry include inaccurate cost estimation, improper planning and scheduling, unrealistic contract duration and requirements, frequent changes to the scope of work, frequent design changes, inadequate labor/ skill availability, inflation on costs of machinery, labor, material and transportation. |
اللغة | en |
الناشر | Vilnius Gediminas Technical University |
الموضوع | Cost overrun Frequency adjusted cost index Importance index Risk assessment |
النوع | Article |
الصفحات | 1829 - 1844 |
رقم العدد | 5 |
رقم المجلد | 24 |
الملفات في هذه التسجيلة
الملفات | الحجم | الصيغة | العرض |
---|---|---|---|
لا توجد ملفات لها صلة بهذه التسجيلة. |
هذه التسجيلة تظهر في المجموعات التالية
-
الهندسة المدنية [851 items ]