Box Jacking/Pushing Method for Tunnel Construction in Rock: Doha Metro, Gold Line Project
Abstract
The case of a box pushing tunneling method in rock, on Doha Metro Gold Line project,
successfully implemented to connect multiple entrance structures of Sport City station
under a live traffic junction, in a heavy urban environment and under very shallow
overburden is presented. Due to the size of the underpasses, the need to maintain
uninterrupted traffic and the time-consuming utility diversions and reinstatement, the use
of conventional NATM and Cut and Cover methods were assessed as either non-feasible
or of high risk. The dimensions of the unsupported span, the encountered geotechnical
conditions, the development of the settlements at road level and the box advance rate are
presented