Design and Construction Risk Management of Souq Waqif Station of Gold Line, Doha Metro
المؤلف | Konstantis, Spyridon |
المؤلف | Massinas, Spyros |
تاريخ الإتاحة | 2020-04-30T12:31:04Z |
تاريخ النشر | 2020 |
اسم المنشور | Proceedings of the International Conference on Civil Infrastructure and Construction |
الاقتباس | Konstantis S., Massinas S., Design and Construction Risk Management of Souq Waqif Station of Gold Line, Doha Metro, International Conference on Civil Infrastructure and Construction (CIC 2020), Doha, Qatar, 2-5 February 2020, DOI: https://doi.org/10.29117/cic.2020.0025 |
الرقم المعياري الدولي للكتاب | 2958-3128 |
المعرّف | P. O. Box: 2713 Doha-Qatar, Email: qupress@qu.edu.qa |
الملخص | The case of redesigning Souq Waqif station by raising the base slab formation level due to significant water inflow during the excavation and dewatering works and the break in activities of two EPB TBMs under adverse hydrogeological conditions is presented. The station is at close proximity with a structure of great heritage value and the monitoring records prior to TBM break in, indicated unacceptable ground deformation values. Back analyses were performed and contingency measures defined and implemented on site. The station redesign had also to take into consideration an adjacent future development affecting the station, the design basement levels of which increased during the station excavation. |
اللغة | en |
الناشر | Qatar Univesrity Press |
الموضوع | Station Water ingress Ground deformations Stability Redesign |
النوع | Conference |
الصفحات | 182-190 |
ESSN | 2958-3136 |