• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Student Thesis & Dissertations
  • College of Engineering
  • Engineering Management
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Student Thesis & Dissertations
  • College of Engineering
  • Engineering Management
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Construction waste management performance measurement in infrastructure projects by structural equation modelling SEM

    Thumbnail
    View/Open
    Munther Hamaidi_ OGS Approved Thesis.pdf (1.802Mb)
    Date
    2021-06
    Author
    Hamaidi, Munther Farouq M.F.
    Metadata
    Show full item record
    Abstract
    This research aimed to identify the factors that contribute to Construction Waste Management in Infrastructure Projects (CWMIIP) and their effective weight in this aspect. The objectives are summarized to identify the factors affecting construction waste management in infrastructure projects and categorize them under groups, understanding the relationships between the factors and group along with the relationships between groups and CWMIIP, and finally suggesting recommendations for reducing the construction waste. From the literature review, 26 factors were selected to be the major contributors of construction waste in infrastructure projects. These factors were used to designate an online questionnaire to collect the required data to initiate this research, where around 167 participators responded. A Structural Equation Model was developed that represented the relationships between the groups which were identified through the literature review and CWMIIP. This model was examined during model development to ensure that it meets Goodness of Fit (GOF), multivariate normality, construct validity, reliability, and hypotheses examinations. The model results have showed that all pre-defined hypotheses were supported except for the positive effect of Logistics group on CWMIIP which was dropped during achieving model acceptance criteria. Finally, the groups that are responsible of construction waste This research aimed to identify the factors that contribute to Construction Waste management in infrastructure projects were ranked based on their effective weight. Management was the most effective group which was followed by Execution, Others, Procurement and Design groups, respectively. Finally, recommendations are provided to industry people based on research outcomes
    DOI/handle
    http://hdl.handle.net/10576/21586
    Collections
    • Engineering Management [‎140‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video