تصفح Theme 4: Water, Environment, and Climate Change حسب الموضوع "Riser shaft"
السجلات المعروضة 1 -- 2 من 2
-
Design Considerations of MPSO Marine Outfall and Diffuser Field
( Qatar University Press , 2023 , Conference Paper)The purpose of the Musaimeer Pump Station and Outfall (MPSO) project is to receive storm water runoff and groundwater flows from the Abu Hamour Tunnel and to provide a pumping station, a marine outfall tunnel and a diffuser ... -
Diffuser Bed Construction Challenges on the Musaimeer Pump Station and Outfall Project
( Qatar University Press , 2023 , Conference Paper)Musaimeer Pump Station and Outfall project (MPSO) is a strategically important drainage asset initiated, developed, and completed by Ashghal in 2022. This project accommodates ground and storm water received from the ...