Show simple item record

AuthorTzaveas, Theodoros
AuthorAnagnostaki, Christina
AuthorMatsuo, Yoji
AuthorSergakis, Georgios
Available date2023-08-27T05:58:12Z
Publication Date2023
Publication Name2nd International Conference on Civil Infrastructure and Construction
CitationAnagnostaki C., Tzaveas T., Sergakis G. & Matsuo Y., "Upgrading Existing Infrastructures - The Case Study of Industrial IC Bridge", The 2nd International Conference on Civil Infrastructure and Construction (CIC 2023), Doha, Qatar, 5-8 February 2023, DOI: https://doi.org/10.29117/cic.2023.0100
ISSN2958-3128
URIhttps://doi.org/10.29117/cic.2023.0100
URIhttp://hdl.handle.net/10576/46803
AbstractDoha, the capital of Qatar, has been facing phenomenal growth of vehicular traffic owing to rapid development which has resulted in traffic congestion causing significant rise in travelling time in some areas. To mitigate these problems, upgrading existing intersections and consequently retrofitting the contained structures along significant corridors is a strategy implemented by the Public Works Authority in some cases. A case study presented herewith, is a project awarded as a Design & Build Contract by the PWA to upgrade the infrastructure at the junction of a major corridor (Junction 101 - Industrial Interchange). This paper covers the tender stage and the final design solutions, outlining the simulation models, assessment of the existing structures, the design analysis and the construction methodology adopted to address the operation and maintenance conditions as well as the project specific requirements and constraints.
Languageen
PublisherQatar University Press
SubjectSteel-concrete composite
Condition assessment
Retrofitting
Bridge expansion joints
TitleUpgrading Existing Infrastructures - The Case Study of Industrial IC Bridge
TypeConference
Pagination769-779
ESSN2958-3136
dc.accessType Open Access


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record