Enhancing Micro-Tunnelling Activity in Infrastructure Construction Adopting Hybrid Lean Approaches: A Case Study
المؤلف | Kamal, Asghar |
المؤلف | Al-Tamimi, Saoud Ali |
المؤلف | Hakouz, Jamal |
المؤلف | Shalabi, Maryam |
المؤلف | Naser, Ayman |
تاريخ الإتاحة | 2023-08-31T06:57:02Z |
تاريخ النشر | 2023 |
اسم المنشور | 2nd International Conference on Civil Infrastructure and Construction |
الاقتباس | Kamal A., Hakouz J., Zakaria Y., Shalabi M., Naser A. & Al-Tamimi S.A., "Enhancing Micro-Tunnelling Activity in Infrastructure Construction Adopting Hybrid Lean Approaches: A Case Study", The 2nd International Conference on Civil Infrastructure and Construction (CIC 2023), Doha, Qatar, 5-8 February 2023, DOI: https://doi.org/10.29117/cic.2023.0026 |
الرقم المعياري الدولي للكتاب | 2958-3128 |
الملخص | Micro-tunnelling Shaft Excavation (MTSE) is a major part in the development of infrastructure networks in Public Works Authority (ASHGHAL) projects in the State of Qatar. Despite the importance of this activity there has been minimal improvement to the existing methodology. Traditional methods are producing large amount of operational waste such as extra manhours, over-excavation and excess of backfilling materials used. Using collaborative pull planning, a system involving key stakeholders and last planners have been developed to streamline the micro-tunnelling activity. Using a panoply of lean tools, data collection and analysis, MTSE was monitored and evaluated through the Plan, DO, Check and Act (PDCA) cycle that led to around 60% of time saving. The paper summarises the process improvement using collaborative pull planning and applying PDCA with project stakeholders' engagement. |
اللغة | en |
الناشر | Qatar University Press |
الموضوع | Lean Construction Collaborative Pull Planning Last Planner System Micro-Tunnelling PDCA |
النوع | Conference |
الصفحات | 163-171 |
ESSN | 2958-3136 |