Show simple item record

AuthorGunduz, Murat
AuthorSahin, Haci Bayram
Available date2024-10-03T10:00:55Z
Publication Date2015-07-04
Publication NameJournal of Civil Engineering and Management
Identifierhttp://dx.doi.org/10.3846/13923730.2015.1041768
CitationGunduz, M., & Sahin, H. B. (2015). An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis (vol 21, pg 470, 2015). JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 21(5), 678-678.
ISSN1392-3730
URIhttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84929152939&origin=inward
URIhttp://hdl.handle.net/10576/59746
AbstractThe printed version of the article “An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis” by Murat Gunduz and Haci Bayram Sahin published in the Journal of Civil Engineering and Management 21(4): 470–477, doi:10.3846/13923730.2014.890657, contained the following error:• On page 477 the author’s biography should read:
Languageen
PublisherVilnius Gediminas Technical University
SubjectCivil Engineering
hydroelectric
TitleErratum: An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis (Journal of Civil Engineering and Management 21:4 (470-477) DOI: 10.3846/13923730.2014.890657)
TypeOther
Pagination678-678
Issue Number5
Volume Number21
ESSN1822-3605
dc.accessType Open Access


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record