عرض بسيط للتسجيلة

المؤلفSenouci, Ahmed B.
المؤلفEl-Bahrawy, Aly N.
تاريخ الإتاحة2009-11-25T13:05:02Z
تاريخ النشر1999
اسم المنشورEngineering Journal of Qatar University
الاقتباسEngineering Journal of Qatar University, 1999, Vol. 12, Pages 75-89.
معرّف المصادر الموحدhttp://hdl.handle.net/10576/7909
الملخصReinforcing steel bars are generally procured in standard lengths. The cutting of standard steel bars to the specified lengths usually yields an appreciable amount of steel waste. Minimization of steel waste problem is of interest because reinforced concrete structures are currently in extensive use. The generated steel waste depends directly upon the selected cutting schedule. A dynamic programming method is presented for the selection of cutting schedules of minimum steel waste. Two examples are presented to illustrate the computational process of the method and to compare its results with those obtained by El-Bahrawy (1995).
اللغةen
الناشرQatar University
الموضوعEngineering: Research Papers
العنوانOptimum Cutting Schedule Of Reinforcing Steel Bars
النوعArticle
الصفحات75-89
رقم المجلد12
dc.accessType Open Access


الملفات في هذه التسجيلة

Thumbnail

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة