المؤلفSenouci, Ahmed
المؤلفAl-Derham, Hassan R.
تاريخ الإتاحة2016-09-26T11:04:18Z
تاريخ النشر2006
اسم المنشورProceedings of the 5th International Conference on Engineering Computational Technology (2006)
المصدرScopus
الاقتباسA. Senouci, H.R. Al-Derham, "A Multi-objective Genetic Algorithm Model for Time-Cost Trade-Off Analysis of Construction Projects", in B.H.V. Topping, G. Montero, R. Montenegro, (Editors), "Proceedings of the Fifth International Conference on Engineering Computational Technology", Civil-Comp Press, Stirlingshire, UK, Paper 50, 2006.
الرقم المعياري الدولي للكتاب1759-3433
معرّف المصادر الموحدhttp://dx.doi.org/10.4203/ccp.84.50
معرّف المصادر الموحدhttp://hdl.handle.net/10576/4780
الملخصTime-cost trade-off analysis is one of the most important aspects of construction project planning and control. There are trade-offs between time and cost to complete the activities of a project. Existing methods for time-cost trade-off analysis are not efficient enough to solve large-scale CPM networks (hundreds of activities or more). This paper presents an advanced and robust multi-objective genetic algorithm model for the time-cost trade-off analysis of construction projects. The model allows construction planners to generate and evaluate optimal/near-optimal trade-offs between project durations and total costs. The computations in the present model are organized in three major modules. A scheduling module that develops practical schedules for construction projects. A cost module that computes the project direct, indirect, and total costs. A multi-objective module that searches for and identifies optimal/near optimal tradeoffs between project duration and total cost. An illustrative example is presented to illustrate the use of the model and to demonstrate its capabilities in the time-cost trade-off analysis of construction projects.
اللغةen
الناشرCivil-Comp Press
الموضوعConstruction planners
Construction projects
Illustrative examples
Multi objective
Multi objective optimizations (MOO)
Optimal tradeoffs
Project duration
Scheduling module
Time cost
Time-cost trade-off analysis
Total costs
العنوانA multi-objective genetic algorithm model for time-cost trade-off analysis of construction projects
النوعConference Paper