Show simple item record

AuthorSenouci, Ahmed B.
AuthorAl-Derham, H.R.
Available date2009-12-28T07:54:54Z
Publication Date2007-08-15
Publication NameAdvances in Engineering Software
Identifierhttp://dx.doi.org/10.1016/j.advengsoft.2007.08.002
CitationAhmed Senouci, Hassan R. Al-Derham, Genetic algorithm-based multi-objective model for scheduling of linear construction projects, Advances in Engineering Software, Volume 39, Issue 12, December 2008, Pages 1023-1028
URIhttp://hdl.handle.net/10576/10518
AbstractThis paper presents a genetic algorithm-based multi-objective optimization model for the scheduling of linear construction projects. The model allows construction planners to generate and evaluate optimal/near-optimal construction scheduling plans that minimize both project time and cost. The computations in the present model are organized in three major modules. A scheduling module that develops practical schedules for linear construction projects. A cost module that computes the project's costs. A multi-objective module that searches for and identifies optimal/near-optimal tradeoffs between project time and cost. An application example is analyzed to illustrate the use of the model and to demonstrate its capabilities in optimizing the scheduling of linear construction projects.
Languageen
PublisherElsevier Ltd
SubjectCost control
Genetic algorithms
Information technology (IT)
Linear construction projects
Multi-objective optimization
Scheduling
TitleGenetic algorithm-based multi-objective model for scheduling of linear construction projects
TypeArticle


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record