• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
  • المساعدة
    • إرسال الأعمال الأكاديمية
    • سياسات الناشر
    • أدلة المستخدم
    • الأسئلة الأكثر تكراراً
  • عن المستودع الرقمي
    • الرؤية والرسالة
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 4: Sustainability, Renovation, and Monitoring of Civil Infrastructure
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 4: Sustainability, Renovation, and Monitoring of Civil Infrastructure
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Water Supply from Turkey to Cyprus Island with Suspended Marine Pipeline

    Thumbnail
    عرض / فتح
    CIC2020_ Artcile100.pdf (3.584Mb)
    التاريخ
    2020
    المؤلف
    Ozturk, Izzet
    Agiralioglu, Necati
    Ozdemir, Omer
    Akinci, Nasir
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    More than 90% of the water requirement for the Turkish Republic of Northern Cyprus (TRNC/KKTC) was being supplied from groundwater resources, while the rest was being provided from surface waters and seawater until the 1990s. Due to excessive water abstractions above their natural feeding levels, most of the aquifers had salinization as a result of sea water interference with electrical conductivity (EC) value exceeding 7000 mmho/cm. In order to provide a permanent and long-term solution to the water problem in TRNC, a sea-crossing suspended water transmission pipeline (TRNC Water Supply) project has been developed for sustainable water transfer from Turkey to the Cyprus Island. While the initial feasibility and conceptual design studies have been prepared for State Hydraulic Works (DSI) in 1998-1999, the implementation projects and tender documents have been completed in 2006-2009, and the construction of the suspended marine pipeline has started in 2011 as commissioned by DSI. The engineering supervision and consultancy services of the project have been provided by a team from Istanbul Technical University (ITU). The project, which has been fully completed in October 2015 had a total cost of 1.6 x 109 TL (600 x 106 $), including expropriation costs. The unit cost of the water with flowrate 75 x 106 m3/year is calculated to be 0.6 $/m3 (n=15 x 50 years, i=0.08), and the investment is expected to be repaid in 5.3 years. In this article, design details of the suspended marine pipeline and its critical components of this unique project are presented.
    معرّف المصادر الموحد
    http://www.cic.qa
    DOI/handle
    http://dx.doi.org/10.29117/cic.2020.0107
    http://hdl.handle.net/10576/14693
    المجموعات
    • Theme 4: Sustainability, Renovation, and Monitoring of Civil Infrastructure [‎36‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    عن المستودع الرقمي

    الرؤية والرسالة

    المساعدة

    إرسال الأعمال الأكاديميةسياسات الناشرأدلة المستخدمالأسئلة الأكثر تكراراً

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    Video