Show simple item record

AuthorMsakni, Mohamed Kais
AuthorAl-Salem, Mohammed
AuthorDiabat, Ali
AuthorRabadi, Ghaith
AuthorKotachi, Mariam
Available date2020-11-26T11:21:08Z
Publication Date2017
Publication NameProceedings - 2016 International Conference on Computational Science and Computational Intelligence, CSCI 2016
ResourceScopus
URIhttp://dx.doi.org/10.1109/CSCI.2016.0241
URIhttp://hdl.handle.net/10576/17088
AbstractThis paper investigates the integrated quay crane assignment and scheduling problem (QCASP). The problem requires determining the assignment of quay cranes to vessels and the scheduling of operations to be performed by each quay crane. Different practical aspects of the problem are considered including non-crossing and safety margin constraints. The resulting problem is NP-complete and, therefore, requires advanced techniques to solve it. For this purpose, we propose an exact method based on a branch-and-price algorithm. Computational experiments show that the proposed method can solve large-sized problems efficiently.
Languageen
PublisherInstitute of Electrical and Electronics Engineers Inc.
SubjectBranch-and-Price
Modeling
Optimization
Quay Crane Assignment
Quay Crane Scheduling
TitleAn Integrated Quay Crane Assignment and Scheduling Problem Using Branch-and-Price
TypeConference Paper
Pagination1286-1291
dc.accessType Abstract Only


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record