Minimizing the total completion time in a two-machine flowshop problem with time delays
المؤلف | Msakni, Mohamed Kais |
المؤلف | Khallouli, Wael |
المؤلف | Al-Salem, Mohamed |
المؤلف | Ladhari, Talel |
تاريخ الإتاحة | 2021-09-01T10:02:47Z |
تاريخ النشر | 2016 |
اسم المنشور | Engineering Optimization |
المصدر | Scopus |
الملخص | This article proposes to solve the problem of minimizing the total completion time in a two-machine permutation flowshop environment in which time delays between the machines are considered. For this purpose, an enumeration algorithm based on the branch-and-bound framework is developed, which includes new lower and upper bounds as well as dominance rules. The computational study shows that problems with up to 40 jobs can be solved in a reasonable amount of time. |
اللغة | en |
الناشر | Taylor and Francis Ltd. |
الموضوع | Branch and bound method Time delay Computational studies Enumeration algorithms Flow-shops Iterated greedy algorithm Lower and upper bounds Lower bounds Permutation flow shops Time lag Problem solving |
النوع | Article |
الصفحات | 1164-1181 |
رقم العدد | 7 |
رقم المجلد | 48 |