عرض بسيط للتسجيلة

المؤلفHattab, A.
المؤلفHaouari, M.
تاريخ الإتاحة2023-01-23T08:18:14Z
تاريخ النشر2016
اسم المنشورIEEE International Conference on Industrial Engineering and Engineering Management
المصدرScopus
معرّف المصادر الموحدhttp://dx.doi.org/10.1109/IEEM.2016.7798166
معرّف المصادر الموحدhttp://hdl.handle.net/10576/38719
الملخصIn this paper, the classical Resource Investment Problem (RIP) is extended to consider time-depended resource cost instead of time-independent resource cost. The problem is named as the Resource Investment Problem with Time-Dependent Resource Cost and Tardiness Penalty (RIP-TDRC). The objective of the problem is to minimize the sum of the resources cost and the tardiness cost. Two versions of this problem are addressed in this paper, the deterministic version and the stochastic version. A simulation-optimization based algorithm which combines mathematical formulation solution with simulation is proposed to find an optimal solution. The performance of the proposed algorithm and the effect of some problem parameters on the solution are assessed through computational experiments. 2016 IEEE.
اللغةen
الناشرIEEE Computer Society
الموضوعResource investment problem
Robust scheduling
simulation-optimization
العنوانRobust Resource Investment Problem with Time-Dependent Resource Cost and Tardiness Penalty
النوعConference Paper
الصفحات1693-1698
رقم المجلد2016-December
dc.accessType Abstract Only


الملفات في هذه التسجيلة

الملفاتالحجمالصيغةالعرض

لا توجد ملفات لها صلة بهذه التسجيلة.

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة