الاقتباسAl Marri D.A. & Al Kaabi N., "Why Construction Projects are Delayed in PWA: Problems and Solutions", The 2nd International Conference on Civil Infrastructure and Construction (CIC 2023), Doha, Qatar, 5-8 February 2023, DOI: https://doi.org/10.29117/cic.2023.0049
الرقم المعياري الدولي للكتاب2958-3128
معرّف المصادر الموحدhttps://doi.org/10.29117/cic.2023.0049
معرّف المصادر الموحدhttp://hdl.handle.net/10576/47083
الملخصConstruction is, by its nature, complex and uncertain. Changes and variations are inherently part of many construction projects, which require serious efforts to overcome. Project delay is a construction problem resulting in contractual claims, increased project cost, and decreased end-user satisfaction. This study investigates the root causes of project delay in Public Works Authority construction projects and gathers different perceptions on the causes of delay to propose a solution matrix that mitigate the effect of those delays and prevents its reoccurrence in future projects. A sample of over two-handed projects in 2021 have been granted an extension of time to its original completion date have been studied to identify and analyse the root causes of project delay and the risk relevant to the project delivery being prolonged. For these reasons, a categorization of delay has been adopted, and every cause of delay has been coded. The method adopted to identify the top root causes of project delay was the Pareto Analysis (Pareto analysis is premised on the idea that 80% of problems can be traced to 20% of the causes). The result of the study was the development of a holistic solution matrix to address the root causes of delay. The solution consists of two parts, (1) identify the relevant corrective, immediate and preventive actions, and (2) develop a responsibility matrix for the implementation of those solutions to ensure its governance.
اللغةen
الناشرQatar University Press
الموضوعConstruction projects
Delay
Cost
Problem Solution Matrix
Public Works Authority
العنوانWhy Construction Projects are delayed in PWA: Problems and Solutions
النوعConference Paper
الصفحات359-363