عرض بسيط للتسجيلة

المؤلفSenouci, Ahmed
المؤلفAl-Derham, Hassan R.
تاريخ الإتاحة2016-09-26T11:04:18Z
تاريخ النشر2006
اسم المنشورProceedings of the 5th International Conference on Engineering Computational Technology (2006)
المصدرScopus
الاقتباسA. Senouci, H.R. Al-Derham, "A Multi-objective Genetic Algorithm Model for Time-Cost Trade-Off Analysis of Construction Projects", in B.H.V. Topping, G. Montero, R. Montenegro, (Editors), "Proceedings of the Fifth International Conference on Engineering Computational Technology", Civil-Comp Press, Stirlingshire, UK, Paper 50, 2006.
الرقم المعياري الدولي للكتاب1759-3433
معرّف المصادر الموحدhttp://dx.doi.org/10.4203/ccp.84.50
معرّف المصادر الموحدhttp://hdl.handle.net/10576/4780
الملخصTime-cost trade-off analysis is one of the most important aspects of construction project planning and control. There are trade-offs between time and cost to complete the activities of a project. Existing methods for time-cost trade-off analysis are not efficient enough to solve large-scale CPM networks (hundreds of activities or more). This paper presents an advanced and robust multi-objective genetic algorithm model for the time-cost trade-off analysis of construction projects. The model allows construction planners to generate and evaluate optimal/near-optimal trade-offs between project durations and total costs. The computations in the present model are organized in three major modules. A scheduling module that develops practical schedules for construction projects. A cost module that computes the project direct, indirect, and total costs. A multi-objective module that searches for and identifies optimal/near optimal tradeoffs between project duration and total cost. An illustrative example is presented to illustrate the use of the model and to demonstrate its capabilities in the time-cost trade-off analysis of construction projects.
اللغةen
الناشرCivil-Comp Press
الموضوعConstruction planners
Construction projects
Illustrative examples
Multi objective
Multi objective optimizations (MOO)
Optimal tradeoffs
Project duration
Scheduling module
Time cost
Time-cost trade-off analysis
Total costs
العنوانA multi-objective genetic algorithm model for time-cost trade-off analysis of construction projects
النوعConference Paper
dc.accessType Abstract Only


الملفات في هذه التسجيلة

الملفاتالحجمالصيغةالعرض

لا توجد ملفات لها صلة بهذه التسجيلة.

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة