عرض بسيط للتسجيلة

المؤلفGunduz, Murat
المؤلفAbu-Hijleh, Abdulrahman
تاريخ الإتاحة2024-10-01T09:59:32Z
تاريخ النشر2020-10-17
اسم المنشورSustainability (Switzerland)
المعرّفhttp://dx.doi.org/10.3390/su12208614
الاقتباسGunduz, M., & Abu-Hijleh, A. (2020). Assessment of human productivity drivers for construction labor through importance rating and risk mapping. Sustainability, 12(20), 8614.
معرّف المصادر الموحدhttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85093099605&origin=inward
معرّف المصادر الموحدhttp://hdl.handle.net/10576/59632
الملخصLabor constitutes a significant portion of the overall cost of a construction project, where labor productivity is often the main driver of the cost. Although studies on labor productivity factors exist, their frequency of occurrence in terms of their ranking remains unexplored. This study differs from other studies in the literature by introducing the frequency component to the productivity factors, a more realistic ranking of the factors by adjusting the importance by frequency (frequency adjusted importance index) and risk mapping of the factors. Moreover, this study is the first to apply risk mapping on labor productivity drivers. The aim of this paper is to identify the project factors affecting the labor productivity in construction projects and to rank these factors considering the perception of the industry on project performance. A literature review of past relevant studies was performed to identify and draft a list of factors affecting labor productivity in construction projects. Thirty-seven labor productivity factors were presented in a questionnaire to investigate the impact and frequency of their occurrence in construction projects. A 9-point scale structured questionnaire was constructed to measure the importance and the frequency of the factors and to evaluate the ranking for different categories. The frequency adjusted importance index (FAII), Spearman’s rank correlation, and risk mapping were used to study and analyze the 105 completed responses. The participants rated the following factors as the five most significant labor productivity-influencing factors: (1) poor labor supervision, (2) delays in payments, (3) poor work environment, (4) lowly skilled labor, and (5) bad weather conditions.
اللغةen
الناشرMultidisciplinary Digital Publishing Institute (MDPI)
الموضوعConstruction industry
Key performance indicators
Labor productivity
Planning
Project management
Project success factors
Risk assessment
Risk management
Sustainability
العنوانAssessment of human productivity drivers for construction labor through importance rating and risk mapping
النوعArticle
رقم العدد20
رقم المجلد12
ESSN2071-1050
dc.accessType Open Access


الملفات في هذه التسجيلة

Thumbnail

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة