الاقتباسGunduz, M., & Sahin, H. B. (2015). An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis. Journal of Civil Engineering and Management, 21(4), 470-477.
الرقم المعياري الدولي للكتاب1392-3730
معرّف المصادر الموحدhttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84937432413&origin=inward
معرّف المصادر الموحدhttp://hdl.handle.net/10576/59688
الملخصEnergy is increasingly becoming more important in today's world, whereas energy sources are drastically decreasing. One of the most valuable energy sources is hydro energy. Because of limited energy sources and excessive energy usage, cost of energy is rising. Among the electricity generation units, hydroelectric power plants are very important, since they are renewable energy sources and they have no fuel cost. To decide whether a hydroelectric power plant investment is feasible or not, project cost and amount of electricity generation of the investment should be precisely estimated. In this paper, fifty four hydroelectric power plant projects are analysed by using multiple regression and artificial neural network tools. As a result, two cost estimation models have been developed to estimate the hydroelectric power plant project cost in early stages of the project.
اللغةen
الناشرVilnius Gediminas Technical University
الموضوعartificial neural network
early cost estimation
hydroelectric power plants
multiple regression analysis
العنوانAn early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis
النوعArticle
الصفحات470-477
رقم العدد4
رقم المجلد21
ESSN1822-3605
dc.accessType Open Access


الملفات في هذه التسجيلة

Thumbnail

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة