• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 1: Contemporary issues in Construction Engineering and Management
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 1: Contemporary issues in Construction Engineering and Management
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A Side-by-Side Comparison of Shaft Excavation locally in Qatar

    Thumbnail
    عرض / فتح
    024.pdf (630.5Kb)
    التاريخ
    2023
    المؤلف
    Brown, John
    Saurabh, Sunit
    Akslakhi, Ahmed
    Mohannadi, Eisa
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    The city of Doha has grown and expanded rapidly in the last 20 years, but this growth has strained the city's infrastructure, including its aging sewerage system and treatment facilities. The Public Works Authority (Ashghal) has therefore launched several strategic schemes which involve shallow and deep sewer tunnels and a new sewage treatment works (STW) to serve Doha's growing population in the years to come. One such schemes is the C853/1 Wakrah-Wukair Drainage Network Branches (WWDNB), which includes more than 15 km of bored pipes between 400mm and 2.4m inner pipeline diameter, with more than 60 shafts ranging in depths from 10m to 47m. The geology in the Wukair area is made up of several distinct strata, typically ranging in material strength between 10 and 48MPa, and it is the range of strengths that decides the method of shaft excavation. This paper will provide a production comparison between two types of excavation methods adopted for the same depth shafts and geological conditions. In the first method, the Contractor adopted the more traditional method using an excavator with appropriate attachments to break the ground, where this progressed in a cyclical manner until the shaft base was reached. The second method incorporated a piling rig to drill a specific pattern of holes within the shaft envelope, which enabled a faster excavation cycle and allowed for time and cost savings as well as improved safety. This paper will assess both methods, why both were utilised, and the lessons learnt.
    معرّف المصادر الموحد
    https://doi.org/10.29117/cic.2023.0024
    DOI/handle
    http://hdl.handle.net/10576/47058
    المجموعات
    • Theme 1: Contemporary issues in Construction Engineering and Management [‎39‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    Video