• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 1: Contemporary issues in Construction Engineering and Management
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 1: Contemporary issues in Construction Engineering and Management
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    An Exploration into Delay-Influencing Factors on Healthcare Construction Projects: The Case of Saudi Arabia

    Thumbnail
    عرض / فتح
    039.pdf (322.9Kb)
    التاريخ
    2023
    المؤلف
    Almutairi, Bader
    Bin Mahmoud, Abdulrahman
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    The construction project's delay is one of the biggest challenges that concern practitioners in the construction industry. The success or failure of construction projects is usually measured by the building team's achievement of the project's goals and objectives (ex., time and cost). The Kingdom of Saudi Arabia (KSA), one of the largest construction industries in the MENA region, is experiencing significant delays in some construction industry projects for different reasons. The major causes of delays in project completion in the construction sector in the KSA and how sensitive it is to healthcare projects specifically differ from one project to another. Thus, there is an urgent need to identify construction project-specific causes of delay in the healthcare sector. The research is based on a quantitative approach using the systematic review methodology, where 100 delayed projects in Saudi Arabia were sampled from the healthcare sector, and the causes of delays were captured and recorded. Various factors contributed significantly to the projects' delays, such as change orders, high expenditure, and poor budgetary estimates. This study's results will help project managers reduce the risks of project delays by identifying the influencing factors and their local context, monitoring them, and finding the proper way to mitigate or element their impacts, if possible.
    معرّف المصادر الموحد
    https://doi.org/10.29117/cic.2023.0039
    DOI/handle
    http://hdl.handle.net/10576/47073
    المجموعات
    • Theme 1: Contemporary issues in Construction Engineering and Management [‎39‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    Video