• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Student Thesis & Dissertations
  • College of Engineering
  • Engineering Management
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Student Thesis & Dissertations
  • College of Engineering
  • Engineering Management
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Improving the Process of Preventive Maintenance for Critical Telecommunications Stations in Qatar

    Thumbnail
    View/Open
    Ahmed Alkuwari _OGS Approved Project.pdf (1.366Mb)
    Date
    2020-06
    Author
    Alkuwari, Ahmed K.
    Metadata
    Show full item record
    Abstract
    Critical public safety telecommunications networks in Qatar shall be secure, reliable, and fast response networks. These networks are serving the security teams and forces of Qatar. As a result, these networks shall be maintained on the highest standards in order to meet the basic requirements of providing an available and reliable Mission Critical Communications Networks (MCCN). Hence, the goal of this project is to improve the process of preventive maintenance by the Field Maintenance Teams (FMT) in the Ministry of Interior (MOI). Several limitations and challenges are facing these teams while planning and performing the Preventive Maintenance (PM) tasks. This project shall be used to increase the productivity of the FMT by improving the current practices of performing PM activities. A detailed literature review on the areas of lean thinking and scheduling maintenance tasks has been conducted. Then, it was decided to use the VSM (one of the lean thinking tools) to enhance and improve the current PM execution system. There were multiple non-value adding activities that can be planned for and executed before each day of preforming the PM tasks. These activities have been identified and then eliminated, and hence a future state was proposed in this project. This future state system will be implemented directly by the FMT management as it can save almost 40.3% of the total lead time of the system (192 minutes improvement from current to the future system).
    DOI/handle
    http://hdl.handle.net/10576/15163
    Collections
    • Engineering Management [‎146‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video