Search
Now showing items 1-10 of 11
Work force assignment and planning for onshore oil and gas wells cementing operations
(Engineering Management, 2016 , Professional Masters Project)
In oil and gas well cementing operations, workers are exposed to long consecutive hours of work and irregular off times due to the nature of such service and inefficient workforce assignment. Overloading human resources ...
Simulation of sulfur recovery process and optimization of the main operational parameters
(Engineering Management, 2016 , Professional Masters Project)
Strict environmental regulations has pushed sulfur emissions from natural gas and crude
oil refining plants to very low levels. The current and most widely used method for
reducing those emissions is the Claus sulfur ...
Causes of Cost-Overrun in Construction Projects
(Engineering Management, 2016 , Professional Masters Project)
Cost overrun in construction projects is a common issue affecting project performance. After a review of the literature, a list of 39 cost overrun attributes were gathered and presented in a survey questionnaire. The survey ...
Effective framework for change order management in construction industry
(Engineering Management, 2016 , Professional Masters Project)
Construction is a multi-trillion-dollar industry with a very complex nature involving a balanced combination of many human, non-human and other factors. The change orders are a practical reality of the construction industry ...
Factors of successful technology transfer in oil and gas industry in Qatar State
(Engineering Management, 2016 , Professional Masters Project)
Technology transfer is highly regarded in business circles and it is one of the vital business strategies. Any developed country seeks to own a new technology and to be transformed from technology receiver to technology ...
Sustainable solutions for domestic solid waste management in Qatar
(Engineering Management, 2016 , Professional Masters Project)
Due to the fact that Qatar has increased its investments and projects worldwide, Qatar has become one of the world’s fastest growing economy and highest paid GDP. As a result, the population has increased in the last few ...
Analyzing the reliability and effectiveness of public school evaluation system in Qatar
(Engineering Management, 2016 , Professional Masters Project)
In 2004, Qatar government launched a huge education reform, Education for New Era (EFNE) which introduced changes to the K-12 educational system. The reform model suggested by Research and Development Cooperation (RAND) ...
Carbon emissions Inventory Games
(Engineering Management, 2016 , Master Thesis)
Carbon emissions reduction has been the center of attention in many organizations during the past few decades. Many international entities developed rules and regulations to monitor and control carbon emissions especially ...
INTEGRATION OF INNOVATION IN CONSTRUCTION MANAGEMENT
(Engineering Management, 2016 , Master Thesis)
Effective construction management is the best practice in the construction sector to achieve the project objectives and the vision for the company. The projects require high level of challenges to maintain the continuous ...
ROBUST RESOURCE INVESTMENT PROBLEM WITH TIME-DEPENDENT RESOURCE COST AND TARDINESS PENALTY
(Engineering Management, 2016 , Master Thesis)
The Resource Investment Problem (RIP) is a variant of the well-known Resource Constraint Project Scheduling Problem (RCPSP) that requires finding the optimal resource allocation, given a preset completion date, with the ...