• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Mechanical & Industrial Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Mechanical & Industrial Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimization of reliability and maintenance of liquefaction system on FLNG terminals using Markov modelling

    Thumbnail
    Date
    2014
    Author
    Gowid, Samer
    Dixon, Roger
    Ghani, Saud
    Metadata
    Show full item record
    Abstract
    Purpose: The purpose of this paper is to optimize system redundancy and maintenance intervals of a propane pre-cooled mixed refrigerant (C3MR) liquefaction process on floating liquefied natural gas (FLNG) export platforms. Design/methodology/approach: The reliability modeling is based on the time-dependent Markov approach. Four different system options are studied, with various degree of redundancy. Failures in the liquefaction system usually lead to shutdown the whole LNG production plant. The associated shutdown cost is compared with the cost of introducing redundancy and the cost of onboard maintenance. To ensure a high profitability, a model for maintenance optimization is utilized and applied to the main unit of the C3MR liquefaction system to minimize the onboard maintenance cost. Findings: The results indicated that the introduction of a second liquefaction system (as a standby unit) is the best option for liquefaction plant in terms of reliability and cost. This will substantially reduce the unavailability from 14.7 to 2.19 percent of the total operational hours. Based on the presented system configuration, the annual system profit will increase by 180 million USD if the redundancy is implemented on FLNG export ships. The optimum maintenance intervals of major process components are also calculated to minimize the total cost of maintenance. Originality/value: The originality of this paper lies within the context in investigating the reliability of the C3MR liquefaction system on LNG floating export terminals using Markov modeling for the first time.
    DOI/handle
    http://dx.doi.org/10.1108/IJQRM-12-2012-0156
    http://hdl.handle.net/10576/53023
    Collections
    • Mechanical & Industrial Engineering [‎1461‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video