Genetic algorithm-based multi-objective model for scheduling of linear construction projects
Author | Senouci, Ahmed B. |
Author | Al-Derham, H.R. |
Available date | 2009-12-28T07:54:54Z |
Publication Date | 2007-08-15 |
Publication Name | Advances in Engineering Software |
Identifier | http://dx.doi.org/10.1016/j.advengsoft.2007.08.002 |
Citation | Ahmed Senouci, Hassan R. Al-Derham, Genetic algorithm-based multi-objective model for scheduling of linear construction projects, Advances in Engineering Software, Volume 39, Issue 12, December 2008, Pages 1023-1028 |
Abstract | This paper presents a genetic algorithm-based multi-objective optimization model for the scheduling of linear construction projects. The model allows construction planners to generate and evaluate optimal/near-optimal construction scheduling plans that minimize both project time and cost. The computations in the present model are organized in three major modules. A scheduling module that develops practical schedules for linear construction projects. A cost module that computes the project's costs. A multi-objective module that searches for and identifies optimal/near-optimal tradeoffs between project time and cost. An application example is analyzed to illustrate the use of the model and to demonstrate its capabilities in optimizing the scheduling of linear construction projects. |
Language | en |
Publisher | Elsevier Ltd |
Subject | Cost control Genetic algorithms Information technology (IT) Linear construction projects Multi-objective optimization Scheduling |
Type | Article |
Check access options
Files in this item
Files | Size | Format | View |
---|---|---|---|
There are no files associated with this item. |
This item appears in the following Collection(s)
-
Civil and Environmental Engineering [851 items ]