Show simple item record

AuthorGunduz, Murat
AuthorElsherbeny,Hesham A.
Available date2020-04-30T12:31:03Z
Publication Date2020
Publication NameProceedings of the International Conference on Civil Infrastructure and Construction
CitationGunduz M., Elsherbeny H. A., Practical Implementation of Contract Administration Performance Model in Qatar Construction Projects, International Conference on Civil Infrastructure and Construction (CIC 2020), Doha, Qatar, 2-5 February 2020, DOI: https://doi.org/10.29117/cic.2020.0009
ISSN2958-3128
IdentifierP. O. Box: 2713 Doha-Qatar, Email: qupress@qu.edu.qa
URIwww.cic.qa
URIhttp://dx.doi.org/10.29117/cic.2020.0009
URIhttp://hdl.handle.net/10576/14659
AbstractGlobally, the performance of Construction Contract Administration (CCA) is becoming of significant interest as the industry suffers from notable delays, cost overruns, and disputes as a consequence of poor contract administration practices. In Qatar, the pace of projects will continue after hosting the FIFA 2022 World Cup to achieve the 2030 Qatar National Vision and beyond, therefore, monitoring of the proper CCA implementation and performance is necessary. Due to the wide scope and complicated nature of CCA, there is yet no consensus on how to assess its performance. This study briefly presents a systematic, operational, and multi-dimensional construction Contract Administration Performance Framework (CAPF) consisting of 93 CCA key measures/ tasks categorized in 11 CCA dimensions/process groups. The proposed framework is validated by structural equation modeling and subsequently, the Contract Administration Performance Model (CAPM) model was established. Through this study, the CAPM and its components are briefly explained, and then implemented on a real-world sample of 13 small, medium, and major construction projects in Qatar covering both public and private sectors, and then the performance is benchmarked. It is found that the model provides an operational basis for measuring the CCA Group Performance Indices (GPI), the overall Construction Contract Administration Performance Index (CCAPI) and support the identification of underperforming groups. The benchmarking value for the CCAPI (77.5%) demonstrates that the level of CCA performance is good. Also, the benchmarking values of GPI (range 74.3% to 87.8%) are good, except risk management (GPI= 50.5%), which needs an improvement program.
Languageen
PublisherQatar Univesrity Press
SubjectOptimized aggregate gradation
Portland-limestone cement
Cementitious content
Concrete pavement
3D FEM model
TitlePractical Implementation of Contract Administration Performance Model in Qatar Construction Projects
TypeConference Paper
Pagination55-64
ESSN2958-3136


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record