Assessment of Response Strategy in Mega Construction Projects
الملخص
"Mega Construction Projects (MCPs) that are executed unavoidably face several of
the organizational challenges and pressures. Due to the stakeholder pressures in the
execution of MCPs, organizations may adopt various strategic responses. Purpose – The
objective of this paper is to investigate the common response strategies (RSs) applied
in MCPs in the State of Qatar, in addition to overcoming the construction problems and
enhance performance during the construction stage. Design/methodology/approach –
A questionnaire survey is carried out among the most important firms in construction
industry in Qatar. Three steps are used to finalize and evaluate the questionnaire before
proceeding with the full survey, validity, pre-testing and pilot study. Quantitative data
analysis is carried through the Statistical Package for Social Science software (SPSS).
Findings – Results define and demonstrate five different types of RSs. They are ranging
from passive to active strategies determined by project organization. The RSs include:
adaptation strategy, avoidance strategy, compromising strategy, dismissal strategy, and
influence strategy. Originality/value – This paper identifies and evaluates the RSs in
MCPs that could potentially improve project team more efficiently and effectively."
معرّف المصادر الموحد
http://www.cic.qaالمجموعات
- Theme 1: Construction Management and Process [27 items ]