Replacement policies for a parallel system with shortage and excess costs
View/ Open
Publisher version (Check access options)
Check access options
Date
2016Metadata
Show full item recordAbstract
It has been assumed in most maintenance models that (i) the number of units for a parallel system can be predefined precisely, (ii) maintenance cost after failure should be avoided, and (iii) age replacement can always be performed at its optimized times. However, these assumptions are challenged from practical perspectives in this paper. For this purpose, shortage and excess costs, which claim that replacement done too early before failure involves a waste of operation, are introduced into replacement models, such as replacement plans with time T or distribution G(t) for constant n or random N of units. Furthermore, the number N of working times and the number n of available units for a scheduled replacement time T are discussed. For each model, the expected replacement cost for one cycle and expected replacement cost rate for a long run are optimized, and numerical examples are given. 2016 Elsevier Ltd. All rights reserved.
Collections
- Mechanical & Industrial Engineering [1396 items ]
Related items
Showing items related by title, author, creator and subject.
-
Which replacement is better before or after a specified time for minimal repair models
Chen, Mingchih; Zhao, Xufeng; Nakagawa, Toshio ( International Society of Science and Applied Technologies , 2016 , Conference Paper)This paper compares the models of replacement first, replacement interval, replacement last and replacement overtime to decide which policy would be better before or after a specified time T in the viewpoint of cost saving. ... -
Three maintenances for age replacement policies
Zhao, Xufeng; Al-Khalifa, Khalifa N.; Qian, Cunhua; Nakagawa, Toshio ( International Society of Science and Applied Technologies , 2017 , Conference Paper)Preventive replacement policy conducted at a routine time T* has been surveyed extensively in literatures. Another two random replacement times Y1 and Y2 are jointly considered in this paper. We formulate the models of ... -
Comparisons of replacement policies with periodic times and repair numbers
Zhao, Xufeng; Qian, Cunhua; Nakagawa, Toshio ( Elsevier Ltd , 2017 , Article)Periodic replacement policies modeled with the history of minimal repairs have been studied extensively. However, in the viewpoint of cost rate, there is no literature to compare replacement polices which are carried out ...