Replacement policies for a parallel system with shortage and excess costs
Author | Zhao, Xufeng |
Author | Chen, Mingchih |
Author | Nakagawa, Toshio |
Available date | 2021-09-01T10:03:30Z |
Publication Date | 2016 |
Publication Name | Reliability Engineering and System Safety |
Resource | Scopus |
Abstract | It has been assumed in most maintenance models that (i) the number of units for a parallel system can be predefined precisely, (ii) maintenance cost after failure should be avoided, and (iii) age replacement can always be performed at its optimized times. However, these assumptions are challenged from practical perspectives in this paper. For this purpose, shortage and excess costs, which claim that replacement done too early before failure involves a waste of operation, are introduced into replacement models, such as replacement plans with time T or distribution G(t) for constant n or random N of units. Furthermore, the number N of working times and the number n of available units for a scheduled replacement time T are discussed. For each model, the expected replacement cost for one cycle and expected replacement cost rate for a long run are optimized, and numerical examples are given. 2016 Elsevier Ltd. All rights reserved. |
Sponsor | This work is partially supported by Postdoctoral Research Award PDRA1-0116-14107 from the Qatar National Research Fund, and Ministry of Science and Technology of Taiwan MOST 103-2221-E-030 -008 . |
Language | en |
Publisher | Elsevier Ltd |
Subject | Parallel processing systems Safety engineering Age replacement Maintenance models Parallel system Random replacements Replacement costs Replacement models Replacement policy Working times Costs |
Type | Article |
Pagination | 89-95 |
Volume Number | 150 |
Check access options
Files in this item
Files | Size | Format | View |
---|---|---|---|
There are no files associated with this item. |
This item appears in the following Collection(s)
-
Mechanical & Industrial Engineering [1396 items ]