• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Chemical Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Chemical Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    An innovative design of a solar double-chimney power plant for electricity generation

    Thumbnail
    Date
    2021
    Author
    Abdelsalam E.
    Kafiah F.
    Almomani F.
    Tawalbeh M.
    Kiswani S.
    Khasawneh A.
    Ibrahim D.
    Alkasrawi M.
    ...show more authors ...show less authors
    Metadata
    Show full item record
    Abstract
    The present work involves a new and novel upgrading design to the classical solar chimney power plant (SCPP) structure. The SCPP design was modified by adding a co-centric secondary external chimney to the SCPP structure to enhance energy production. In the new improved design, named the solar double-chimney power plant (SDCPP), the internal chimney, operates like a traditional SCPP to produce electricity during the daytime whereas the secondary external chimney operates as 10 cooling towers (CT) in a series. Each CT is equipped with a turbine and water sprinklers for further energy production. The new design offers the operation of the SCPP during the day and the continuous operation of the CT (day-and-night). A mathematical model that includes the energy and mass balance equations of the system was built using MATLAB. The SDCPP system produced up to 993 MWh of electrical energy, which is 2.6 times higher than the traditional SCPP (377 MWh). The new design configuration achieved a percentage of thermal efficiency (%?th) of 1.6%, which is 200 times greater than the SCPP. The economic assessment of the new system revealed a 50% reduction in the localized cost of energy (LCOE) compared with traditional SCPP. The key advantage of the new design is related to the use of low-cost material in constructing the secondary chimney to reduce the fixed capital cost and prompt the economic feasibility of the system. Overall, the proposed SDCPP offers a feasible and economic solution to produce electricity and to potentially reduce greenhouse gas emissions..
    DOI/handle
    http://dx.doi.org/10.3390/en14196235
    http://hdl.handle.net/10576/30269
    Collections
    • Chemical Engineering [‎1196‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video