بحث بسيط
السجلات المعروضة 11 -- 12 من 12
Multiple parts process planning in serial-parallel flexible flow lines: part I—process plan modeling framework
(
Springer London
, 2015 , Article)
In recent years, integrated process planning and scheduling models have been proposed as solutions that can bridge the gap between practical process planning and production scheduling. However, most structures of these ...
Self-organized TiO2 nanotube layer on Ti–6Al–7Nb for biomedical application
(
Elsevier B.V.
, 2015 , Article)
In the present study, a self-organized nanotube TiO2 layer on Ti–6Al–7Nb was fabricated. The influence of acidic electrolytes including glycerol (G) and ethylene glycol (EG) on the anodization, microstructural features and ...