• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Electrical Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Electrical Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Wind-hydrogen storage in distribution network expansion planning considering investment deferral and uncertainty

    Thumbnail
    View/Open
    Publisher version (You have accessOpen AccessIcon)
    Publisher version (Check access options)
    Check access options
    1-s2.0-S2213138820301624-main.pdf (1.794Mb)
    Date
    2020
    Author
    Mehrjerdi, Hasan
    Hemmati, Reza
    Metadata
    Show full item record
    Abstract
    With respect to the recent developments of hydrogen storage system (HSS), it is relevant to model these storage units in the network expansion planning. Also, most of the available expansion planning tools consider constant locations and sizing for renewable resources and only study the impacts of renewables on the model. It seems that considering variable location and capacity for renewable energies and finding their optimal levels may result in more flexible model. With regard to these issues, this paper presents distribution network expansion planning incorporating wind power and hydrogen storage. The optimal site and size of wind and hydrogen systems are denoted. The stochastic optimization programming is addressed to minimize the plan budgets. The purpose is to defer the investment and operating budgets. The uncertainty modeling is developed to handle the load-wind errors. The achievements demonstrate that the model finds optimal location, sizing, operation pattern, and setting for wind turbines and HSSs while the planning cost is deferred and minimized. 2020 Elsevier Ltd
    DOI/handle
    http://dx.doi.org/10.1016/j.seta.2020.100687
    http://hdl.handle.net/10576/36376
    Collections
    • Electrical Engineering [‎2821‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video