• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Student Thesis & Dissertations
  • College of Engineering
  • Engineering Management
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Student Thesis & Dissertations
  • College of Engineering
  • Engineering Management
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    THE STUDY OF LEAN AND AGILE PROJECT MANAGEMENT APPROACHES IN THE INFORMATION TECHNOLOGY SERVICES DEPARTMENT AT QATAR UNIVERSITY

    Thumbnail
    View/Open
    Zahra Al-Ansari_ OGS Approved Project.pdf (1.077Mb)
    Date
    2023-01
    Author
    AL-ANSARI, ZAHRA Y.
    Metadata
    Show full item record
    Abstract
    The goal of this project is to study the current process that is being carried out at Qatar University's Information Technology Services department when it comes to handling internal project development. This is done by looking at the subject through the lens of agile and lean project management principles. These principles organize the steps in the process such that there is minimal waste to get better efficiency. A tool that is often associated with lean thinking principles was relied on for this project. The tool is the Value Stream Mapping (VSM) tool. This tool helps in showcasing the relations between the steps, the required process time for each one of them, as well as the lead time for each step. From the VSM of the current process, some areas of improvement were determined. After that, the future VSM was created to foresee how the process will be if the adjustments were made. As a result of this study, the processing time was changed from 42,325 minutes to 29,795 minutes. The lead time was also reduced from 118 days to 81 days. The improvement rates were found to be 29.60% and 31.35% for the processing time and the lead time respectively. These rates were achieved by combining some steps of the process, modifying the nature of some steps, eliminating unnecessary steps, and finally some time reduction in some steps to avoid waste.
    DOI/handle
    http://hdl.handle.net/10576/40576
    Collections
    • Engineering Management [‎140‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video