• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • University Publications
  • QU Conference Proceedings
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 2: Advances in Infrastructure Sustainability, Renovation, and Monitoring
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • University Publications
  • QU Conference Proceedings
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 2: Advances in Infrastructure Sustainability, Renovation, and Monitoring
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Top-Down Construction Method: A Case Study For Underpass Structure in Qatar

    Thumbnail
    View/Open
    054.pdf (646.9Kb)
    Date
    2023
    Author
    Kara, Ali
    Chelliah, Anbalagan
    Tzaveas, Theodoros
    Metadata
    Show full item record
    Abstract
    The Cut and Cover construction method has been applied to build several underpass structures within the expressway programme of the Highway Projects Department, Public Works Authority, Qatar. Booming in the construction industry contributes to increasing existing traffic in Qatar. This subsequently failed existing road junctions and required updating the road network parallel to the traffic studied. Underpasses and bridges were planned across many locations in Qatar to increase the level of service at road junctions, enhance the traffic capacity, reduce traffic congestion, and improve the free flow of traffic. This paper discusses the design and construction challenges of the underpass structure constructed by top-down construction method located on D ring Road in Doha, Qatar. The top-down construction method has been suggested by the construction contractor as an alternative to the conventional cut-and-cover construction method to minimize the traffic disruption and meet updated temporary traffic management (TTMs) due to underpass construction works, restore traffic at the junction on top of the underpass prior to the completion of construction works and overall optimize the construction duration. A numerical modelling research was carried out to study the change in arrangements. The site-specific challenges, such as modification in the structural arrangement of the underpass, change in ground conditions, lateral displacement of pile walls and dewatering challenges, are discussed in this paper.
    URI
    https://doi.org/10.29117/cic.2023.0054
    DOI/handle
    http://hdl.handle.net/10576/46757
    Collections
    • Theme 2: Advances in Infrastructure Sustainability, Renovation, and Monitoring [‎68‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video