• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Civil and Environmental Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Civil and Environmental Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analysis of Critical Project Success Factors—Sustainable Management of the Fast-Track Construction Industry

    Thumbnail
    View/Open
    buildings-13-02890-with-cover.pdf (1.161Mb)
    Date
    2023-11-19
    Author
    Naji, Khalid K.
    Gunduz, Murat
    Adalbi, Mohamed
    Metadata
    Show full item record
    Abstract
    Fast-track construction has recently become the prevailing construction approach globally. It enables owners and developers to make rapid returns on investment through shortened construction periods. This strategy has many effects on the industry; therefore, four groups of factors were studied in this project: (1) financial, (2) logistics and finance, (3) management, and (4) legal. A 22-question survey was distributed to 155 professionals in the construction industry, who evaluated the impact of the stated factors on a 5-point scale. The results revealed a high level of consistency determined through Cronbach’s alpha, and a positive correlation was found by Spearman’s rank coefficient. The Relative Importance Index was used to rank the factors based the evaluation by the professionals, resulting in the following impact ranking: (1) poor communication among design and construction teams, (2) large amounts of rework, (3) low quality of work by the contractor, (4) design errors, (5) late or insufficient payment according to terms agreed with the client, and (6) unavailability of materials in the market. By providing a quantitative RII model to evaluate fast-track project management performance with the use of corresponding performance indicators, this study will benefit industry practitioners and researchers as it identifies the most significant factors that impact fast-tract project management performance.
    URI
    https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85178319339&origin=inward
    DOI/handle
    http://dx.doi.org/10.3390/buildings13112890
    http://hdl.handle.net/10576/59600
    Collections
    • Civil and Environmental Engineering [‎869‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video