• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Practical Implementation of Contract Administration Performance Model in Qatar Construction Projects

    Thumbnail
    عرض / فتح
    CIC2020_ Artcile2.pdf (908.1Kb)
    التاريخ
    2020
    المؤلف
    Gunduz, Murat
    Elsherbeny,Hesham A.
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    Globally, the performance of Construction Contract Administration (CCA) is becoming of significant interest as the industry suffers from notable delays, cost overruns, and disputes as a consequence of poor contract administration practices. In Qatar, the pace of projects will continue after hosting the FIFA 2022 World Cup to achieve the 2030 Qatar National Vision and beyond, therefore, monitoring of the proper CCA implementation and performance is necessary. Due to the wide scope and complicated nature of CCA, there is yet no consensus on how to assess its performance. This study briefly presents a systematic, operational, and multi-dimensional construction Contract Administration Performance Framework (CAPF) consisting of 93 CCA key measures/ tasks categorized in 11 CCA dimensions/process groups. The proposed framework is validated by structural equation modeling and subsequently, the Contract Administration Performance Model (CAPM) model was established. Through this study, the CAPM and its components are briefly explained, and then implemented on a real-world sample of 13 small, medium, and major construction projects in Qatar covering both public and private sectors, and then the performance is benchmarked. It is found that the model provides an operational basis for measuring the CCA Group Performance Indices (GPI), the overall Construction Contract Administration Performance Index (CCAPI) and support the identification of underperforming groups. The benchmarking value for the CCAPI (77.5%) demonstrates that the level of CCA performance is good. Also, the benchmarking values of GPI (range 74.3% to 87.8%) are good, except risk management (GPI= 50.5%), which needs an improvement program.
    معرّف المصادر الموحد
    http://www.cic.qa
    DOI/handle
    http://dx.doi.org/10.29117/cic.2020.0009
    http://hdl.handle.net/10576/14659
    المجموعات
    • الهندسة المدنية [‎862‎ items ]
    • Theme 1: Construction Management and Process [‎27‎ items ]
    • أبحاث كأس العالم 2022 [‎164‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    Video