• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Unfair Payment Issues in Construction: Re-Thinking Alternative Payment Method For Tier-1 Contractors to Subcontractors

    Thumbnail
    عرض / فتح
    CIC2020_ Artcile5.pdf (919.8Kb)
    التاريخ
    2020
    المؤلف
    Swai, Laura Peter
    Arewa, Andrew Oyen
    Ugulu, Rex Asibuodu
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    Recent statistics reveal substantial increase in late payments cases from 18% to 27%; with over £30 billion unpaid invoices to UK contractors. Furthermore, 82% of overdue invoices are monies owed to subcontractor by tier-1 main contractors. Indeed, tier-1 contractors are deemed to be the main elephant in the room despite various contractual, government and private initiatives designed to curb late payment menace. Yet, there is little research concerning use of Alternative Payment Method (APM) to leverage tier-1 contractors paying subcontractors’ invoices promptly. The aim of this study is to assess the use APM to enhance pragmatic and sustainable payment practices between tier-1 contractors and subbies. The research question is: what are the industry specific factors that influences unfair payment practices and how can alternative payment method help to leverage fair payments to subbies? The study adopted sequential exploratory design type of mixed method supported by questionnaire and structured interviews. The study population are drawn from experienced industry stakeholders including clients, contractors, designers, professionals in addition to use of computer simulation to validate proposed APM model. Initial findings reveal an optimism bias tendency of most subcontractors agreeing to lengthened and unfair payments terms induced by Tier 1 contractors. The study identified over five industry and business specific influential factors that encourages tier-1 contractors to clinch to unpropitious late payment practices. In specific terms, there are overwhelming evidences that APM has significant potential to minimize late payment in the UK construction industry if there is political, business and legislative will to implement the model.
    معرّف المصادر الموحد
    http://www.cic.qa
    DOI/handle
    http://dx.doi.org/10.29117/cic.2020.0012
    http://hdl.handle.net/10576/14662
    المجموعات
    • Theme 1: Construction Management and Process [‎27‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    Video