• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Preventive Approach to Unsubstantiated Claims and Disputes in the UK Construction Industry

    Thumbnail
    عرض / فتح
    CIC2020_ Artcile7.pdf (879.9Kb)
    التاريخ
    2020
    المؤلف
    Nosheen, Asia
    Arewa, Andrew Oyen
    Akhtar, Hafiz Muhammad
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    Globally, claims and disputes are an unfortunate reality in construction projects. Recent statistics reveal that construction claims in the UK increased by 21% in 2018 compared to other countries such as India (8%), Mexico (3%), Ireland (2%), and Cyprus (2%). Though, construction industry is known for array of standard forms of contract and administrative tendencies; unsubstantiated claims and chronic disputes remain prevalent in the sector. Yet, there is little research on preventive approach to unsubstantiated claims that ultimately lead to disputes. The study advocates the use of Systematic and Technical Appraisal (STA) to prevent unsubstantiated claims and disputes in the construction industry. The study research method is based on qualitative research technique and use of case studies. The research question is: does systematic and technical appraisal of construction claims help prevent unsubstantiated claims and disputes in the UK construction industry? The study population sample is drawn from experienced industry stakeholders including clients, contractors, consultants, experienced quantity surveyors and cost managers in addition to use of construction case studies. Initial findings reveal that claim management processes in the construction sector are far-off from perfection. Other findings reveal that robust systematic and technical claim appraisal process has potential to prevent unsubstantiated claims; which in most cases lead to disputes. The study is part of an on-going PhD study to seek to develop an effective claim management system for the UK construction industry.
    معرّف المصادر الموحد
    http://www.cic.qa
    DOI/handle
    http://dx.doi.org/10.29117/cic.2020.0014
    http://hdl.handle.net/10576/14664
    المجموعات
    • Theme 1: Construction Management and Process [‎27‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    Video